![PPT Layout Suggestions (Horizontal Design Recommended):
You can build the PPT according to the following steps:
Step 1: Establish a Timeline
Draw a horizontal line with an arrow.
Label the time points below the line: Day -5, Day 0, Day 14.
Step 2: Add Intervention Boxes
[Day -5 to Day 0]: Draw a rectangular box above the line.
Text: Abx Pre-treatment (5 days)
Icon: Draw a medicine bottle or capsule (search for "Medicine" in PPT's built-in icons).
[Day 1 to Day 14]: Draw two rectangular boxes side by side above the line (or one large box with two lines of text).
Text 1: FMT (Daily gavage)
Text 2: 5-FU Modeling (i.p. injection)
Icon: Draw a syringe.
Step 3: Add Endpoint Assessments
[After Day 14]: Draw an endpoint box at the end of the line.
Text: Behavioral Tests (e.g., MWM, NOR) & Sacrifice.
Icon: Draw a maze or brain icon.](/_next/image?url=https%3A%2F%2Fpub-8c0ddfa5c0454d40822bc9944fe6f303.r2.dev%2Fai-drawings%2FhEy71njnVlsP4HuJvyX2Zu3Yf1LvoN52%2F4170d6d5-0aed-4f4a-9e9d-d5a9f83a00cb%2F6ea85d23-b2cf-485c-b683-4b52b7b0e667.png&w=3840&q=75)
PPT Layout Suggestions (Horizontal Design Recommended): You can build the PPT according to the following steps: Step 1: Establish a Timeline Draw a horizontal line with an arrow. Label the time points below the line: Day -5, Day 0, Day 14. Step 2: Add Intervention Boxes [Day -5 to Day 0]: Draw a rectangular box above the line. Text: Abx Pre-treatment (5 days) Icon: Draw a medicine bottle or capsule (search for "Medicine" in PPT's built-in icons). [Day 1 to Day 14]: Draw two rectangular boxes side by side above the line (or one large box with two lines of text). Text 1: FMT (Daily gavage) Text 2: 5-FU Modeling (i.p. injection) Icon: Draw a syringe. Step 3: Add Endpoint Assessments [After Day 14]: Draw an endpoint box at the end of the line. Text: Behavioral Tests (e.g., MWM, NOR) & Sacrifice. Icon: Draw a maze or brain icon.
Network Diagram for Early Warning of Clinical Emergencies Du...